Ferroloy moved its production numbers off paper and reached the targets it set.

Ferroloy is an iron foundry in Wichita, Kansas. Its production numbers were recorded by hand, filed, and rarely reviewed. Together we built an Ignition system that reports those numbers the same day instead of a week later. Ferroloy reached the targets it set at kickoff.

Snapshot
  • ClientFerroloy, Wichita, Kansas
  • OwnerMark Soucie, a former CFO who acquired the company in 2017
  • SectorIron foundry, AFS corporate member
  • How it startedA Foundry 4.0 session at CastExpo 2022
  • Built onIgnition
  • Written up byInductive Automation, Modern Casting and Control Global
What Ferroloy committed
Ignition software
$18k
Hardware
$10k
Consulting
$90k
New hire
Process engineer

Mark also hired a process engineer to lead the rollout inside the plant.

The problem

Most production data was recorded on paper.

Like many foundries, Ferroloy collected data but analyzed very little of it. Mark had been a CFO before he bought the foundry, and he asked why each process was run the way it was. In most cases, nobody had the numbers to support the answer.

At CastExpo 2022 he attended a Foundry 4.0 session presented by Jerry Eppler, and afterward he asked us what a project would involve. We scoped what the plant needed to connect Ignition to its equipment, Ferroloy prepared the building, and our foundry engineers led the build.

The targets set at kickoff

Before the build started, Mark defined the goal in writing: lean manufacturing and predictive maintenance, run on data instead of paper. We set four targets at kickoff. In 2026 he confirmed that Ferroloy had reached them:

  • Capacity25–30% more from existing equipment, without buying new production equipment
  • Scrap30–35% less
  • DowntimeMeasure unplanned downtime and bring it down
  • DataEarn revenue from data they were not yet collecting

Targets written down at kickoff. Mark Soucie confirmed in 2026 that Ferroloy reached them.

What we did

We built the system that records the numbers.

The first priority was getting production data into a form people could use. A figure on a clipboard has no value until someone totals it. The Ignition system records what happens on the plant floor and gives each department the numbers it needs.

Results

In 2026 Mark confirmed that Ferroloy had reached the targets set at kickoff. The additional capacity required no new production equipment. It was already available in the existing equipment, and the data showed where.

Clint VenJohn, Ferroloy's process engineer, described the change in Inductive Automation's case study:

"With Ignition, we're able to see more or less up-to-the-minute production data, whereas before we would lag behind by a week or so."

Trends and shift reports are now available in near real time, so the team can identify problems and respond sooner.

Published coverage

Three publications have covered the project: Inductive Automation's case study (with an 11-minute video), Modern Casting (March 2026) and Control Global (September 2025). Together they describe the technical details: a MySQL database tied to Ignition's Tag Historian, Perspective screens for operators pouring 2,700° iron, Sinto molding machines syncing with B&L's Odyssey ERP, and spectrometer data from the QA lab in the same system.

IA case study and video ↗ Modern Casting ↗ Control Global ↗

Your foundry

Tell us what your plant still keeps on paper.

Call us. An engineer will tell you what it would take to move those numbers into Ignition, and whether we are the right fit for the work.

Contact us →
(877) 318-0200
Inductive Automation Premier Integrator badge